Lower Level Finish Project
Our project started as, framing in the lower level; with a finish to be completed at a later date. Once the project was started the homeowner determined it made the most economical sense to complete the finish at the same time as the rough in framing. Our trim carpenter installed Amish built cabinets; in addition we built and installed a recessed area for pool cues. Cherry trim package throughout lower level.